Parallel Generator Systems
Capacity expansion, redundancy and load sharing
Explore →Application Guide
Remote and behind-the-meter projects must coordinate generator controls with renewables, batteries, utility supply and changing site loads.
Remote and behind-the-meter projects must coordinate generator controls with renewables, batteries, utility supply and changing site loads.
Global power demand is increasingly shaped by industrial electrification, data centers and resilient behind-the-meter systems. Prime-power projects require a controls and operating philosophy review before the equipment schedule is frozen.
Define the operating mode, renewable or battery interface, load-management logic, minimum loading, runtime, redundancy, communications and service strategy.
Open sets suit engineered generator rooms; silent or containerized packages suit exposed or noise-sensitive sites. The installation environment determines the correct format.
Fuel autonomy, ATS, load sharing, remote monitoring and parallel requirements are selected from runtime, redundancy and site operating needs.